The Project

This Project was to complete a full installation of a brand-new LV Switch Room consisting of Terminating a client supplied Power Centre, Bespoke Mobile Generator Changeover Panel, Glasgow Isolator Switches, ATS Changeover Panels, containment and small lighting and Power for out client in Swindon.

Project Details

This was cradle to grave from assisting principal contractor with delivery of Power centre to final commissioning and certification of all systems carrying out Pre energisation requests and full LOTO Procedure to ensure safety always comes first. This project consisted of cabling CSA from 1.5mm for Lighting all the way to 400mm for Power centre supply cabling. Full As built containment and LV and Earthing Schematics issued upon completion of works within a timely manner to ensure system is known to all future electricians working.

Category: Pharmaceutical
Job Title LV Switch Room
Contract Value: £45,000